How many 250 kcmil THHN fit in 3-1/2" EMT?
11250 kcmil THHN/THWN-2 wires in 3-1/2" Electrical metallic tubing
11.545 sq in × 40 % = 4.6180 sq in allowed. ÷ 0.3970 sq in per wire = 11.63, so 11.
This pull in numbers
- 11 wires fill
- 37.8 % of 3-1/2" EMT
- Limit for three or more
- 40 %
- For 12 or more
- 4" EMT, up to 15
- Pipe to wire diameter
- 5.39 to 1
- In THW insulation
- 10 fit
- In XHHW-2 insulation
- 12 fit
Before you pull 11
- The ground counts. Every wire in the pipe counts toward fill, the green or bare ground and the neutrals too. 11 is the total, not the hots.
- Derating. If all 11 were current-carrying, each would be adjusted to 50 % of its ampacity (Table 310.15(C)(1)): a 250 kcmil THHN at 290 A in the 90 °C column becomes 145 A. Grounds don't count as current-carrying. How derating works
- Bends. A full pipe pulls hard. Keep to 360° of bends between pull points, less for a tight fill.
250 kcmil THHN in other 3-1/2" conduit
| Conduit | Inside area | Most 250 kcmil THHN |
|---|---|---|
| Electrical metallic tubing | 11.545 | 11 |
| Intermediate metal conduit | 10.584 | 10 |
| Rigid metal conduit (RMC, GRC) | 10.010 | 10 |
| Rigid PVC conduit, Schedule 40 | 9.737 | 10 |
| Rigid PVC conduit, Schedule 80 | 8.688 | 8 |
| Flexible metal conduit (FMC, Greenfield) | 9.621 | 9 |
| Liquidtight flexible metal conduit (LFMC) | 9.731 | 10 |
250 kcmil THHN in other EMT sizes
Other wire sizes in 3-1/2" EMT
#8: 126#6: 91#4: 56#3: 47#2: 40#1: 29#1/0: 25#2/0: 20#3/0: 17#4/0: 14250 kcmil: 11300 kcmil: 10350 kcmil: 9500 kcmil: 6